Voltage Optimisation

Voltage Optimisation

Voltage Optimisation has proven itself as a highly effective energy saving method, with great international success. This technology sets the foundation for any energy efficient initiative resulting in energy, money and the carbon emission savings.

The Problem

  • As a power user, you are completely dependent on the power supply that is delivered to you. Unfortunately this power supply is extremely volatile and constantly changing. This means that your building is subject to fluctuating voltage levels and voltage spikes that damage your running appliances. Voltage levels have been recorded from as low as 200V all the way up to 262V, with the average national voltage level sitting at around 230V.
  • The recently confirmed 3-year tariff hikes will increase your monthly electricity costs, directly decreasing your business’ Net Profit

The Solution

Eldo’s Voltage Optimisation system can help control these problems. It is a turnkey retrofit solution that is easily installed between your building’s municipal supply and main breaker. The system smoothes your incoming voltage supply, resulting in an optimised outgoing voltage level that is safely distributed into your property. This prolongs the life of all your appliances and reduces your monthly electricity costs. The result of this is that the efficiency of your entire electrical supply is increased, unlocking money savings in proportion to future electricity tariff increases.

Benefits

  • Reduces electricity costs by up 15%
  • Reduces Carbon emissions by up to 17%
  • Reduces kVA peak-demand
  • Increased appliance lifespan
  • Surge Protection for all your appliances
  • No maintenance costs
  • Increased electrical capacity
  • Delivers a stable, reliable and efficient electrical supply
  • Turnkey Solution
  • Return on Investment of under 3 years
  • 5-year Guarantee
  • Product Lifecycle of 40 years
    • Tried and Tested Technology

      • Our Voltage Optimisation system is a unique technology that has been tested on the international stage. With installations at Wembley Stadium and other high profile sites, this technology has performed under the most intense scrutiny.
      • The system complies with both local and international safety standards.

      Payment

      We have partnered with Sasfin Limited to offer 3 – 5 year zero-upfront cost rental contracts, whereby the generated electricity savings more than compensate for the monthly rental of the technology. This allows a significant portion of monthly savings to accrue to the customer.